Evanston Historical Home


Basement Remodel
Rework Plumbing to Radiant Heat System
Rework Electric and add New Panel

Removed low hanging cast iron pipes and relocated and replaced with copper pipes.

Relocated hot water heater, installed and relocated new copper pipe for hot water supply.

Installed new electric panel and rewired basement.
 
 
  Remodeled and Finished main room in basement.
Before                                              After 

View from bottom of staircase





New lighting, ceiling, flooring


Low hanging plumbing and electrical pipes



All plumbing and electrical pipes are concealed






Old bathroom on right




New bathroom on left













 

New Bathroom


Remodeled Training / Workout Space
Before                                  After

















Installed new radiant baseboard heat.  Removed plaster ceiling and installed track lighting between floor joists in ceiling.

No comments:

Post a Comment